Beam lifting machine

2022-4-6 14:09:03
一鍵分享:

微信圖片_2019031615333410.jpg

Beam lifting machine

Product introduction

Two beam lifting machines can be used to lift precast beams, or a single crane can be used to lift precast beams with double lifting appliances. The lifting capacity of two beam lifting machines lifting at the same time is generally 450 tons, and the lifting capacity of a single beam lifting machine can usually reach 900 tons. It is equipped with outrigger walking, crown block walking and crown block lifting equipment, which can realize mechanized action. It is mainly used to lift the precast beam from the beam making platform to the beam storage platform. After the curing of the precast beam is completed, it is lifted from the beam storage platform to the beam carrier. Complete the assembly and disassembly of the bridge erecting machine as a lifting equipment. It is also used to erect dry bridges with low pier shafts.

technical requirement

1. The operation speed of the lifting mechanism and the operating mechanism is low, so as to improve the alignment accuracy of the precast beam and reduce the impact on the structure of the beam lifter.

2. The internal space of the beam lifting machine should be large enough to meet the assembly of hoisting precast beams and bridge erecting machines.

3. On the premise of meeting the strength, stiffness and stability of the main steel structure, disassembly and transportation shall be considered.

4. When two precast beams are hoisted, the two machines shall operate synchronously.

Operation and maintenance

1. Operators should be trained and qualified before taking up their posts.

2. Strictly follow the operation requirements and steps.

3. Regularly inspect and maintain mechanical devices and electrical devices.

4. If any problem is found, stop the machine for inspection until the problem is eliminated.