gantry grab crane
1. Product introduction:
MH type all inclusive box "u-brush" electric single beam gantry crane is used together with hoist. It adopts steel pipe legs and has a small windward face. It is a light door in open places and windy areas. There are two operation modes: air operation and ground operation. Lifting capacity gn=2t-20t, span l0m-30m, working environment below 40 ℃, working level 25%, wind pressure not greater than 125pa.
2. Technical features:
The transmission adopts a new generation of three in one system, the electrical appliance adopts contactless module speed regulation control, and can realize micro speed and double speed approaching frequency conversion functions, so that the operation and lifting inching performance are particularly stable. It is equipped with overload alarm skew products, anti hook punching secondary protection, missing item overcurrent and other protection, and the console (handle) adopts 12V voltage to realize the multi-function protection of the hoist and gantry crane from the surface. When the voltage is within 380v+5-- 10%, the electric control can be used for "2million" times for a long time.
3. Selection principle:
Industry of use, starting, jogging times /h, practical time per day h. It must be noted: light crane. Starting and inching are gn/10-80 times /h, gn/2-40 times /h, gn/1-15-20 times /h, high temperature 50 ℃ and harsh environment times /h ÷ 2.
4. Precautions:
① At the operation site, when the crane stops working, the user should lock the crane in time.
② There is no wire above the main switch of this crane. It is strictly prohibited to lift high-temperature molten liquid, flammable, explosive, corrosive, overloaded, dust and other dangerous operations.
③ The total length of the outer suspension of the gantry crane is less than 1/3 of the mid span, and 90% of GN at the limit of the outer suspension. The crane can only run when the weight is moved to the support drive. The weight GN that must be operated by the crane outside the leg shall be reduced by 10-20%. When the external suspension exceeds 1/3 of the midspan, GN shall be reduced by sections. Under the above conditions, the heavy objects must be close to the outrigger crane before operation. Small spans should not be run outside the legs.